The main parameters of the road, taken in designing and presented.

Rated speed:

  • for difficult terrain conditions – 40 km/h;
  • for the highlands – 30 km/h;
  • on the serpentines – 15 km/h.

Number of lanes: 2.

The width of the lanes excluding broadening of the curves: 3?5 m.

The largest longitudinal slopes of major roads: 120‰.

The smallest curve radii: 45 m;

  • On the serpentines – 15 m.

The smallest radius of vertical curves:

  • convex – 600 m;
  • concave – 200 m.

Construction complex is a highway, bridge, upstream and downstream retaining walls and small engineering structures.

The length of the projected road – 6,023 km.

Reconstruction of utilities:

  • A gas pipeline diameter up to 108 mm – 0.85 pm,
  • Water pipe diameter from 50 to 1200 mm – 1152 pm,
  • Sewers diameter from 300 mm – 3125 pm.